CSCS Supervisor Practice Test 5

1 / 50

Where should liquefied petroleum gas (LPG) cylinders supplying an appliance in a site cabin be positioned?

2 / 50

Why must a residual current device (RCD) be used in conjunction with 230-volt electrical equipment?

3 / 50

What should be used to protect passers-by from getting arc eye when electric welding is about to start on your site?

4 / 50

What should you do if you notice that operatives working above a safety net are dropping off-cuts of material and other debris into the net?

5 / 50

If a worker confides in a colleague that they have suffered from a mental health issue, what should the colleague do?

6 / 50

At what minimum noise level must you provide hearing protection to workers if they ask for it?

7 / 50

Why is it dangerous to use inflatable airbags for fall arrest if they are too big for the area to be protected?

8 / 50

Which one of the following statements about mental health is true?

9 / 50

What does the term lower exposure action value (80 decibels (dBA)) mean, when referring to noise?

10 / 50

What should you do if the head on your hammer becomes loose?

11 / 50

What is the main risk to this worker, wearing only these items of personal protective equipment (PPE)?

8.41

12 / 50

What should be included in a method statement for working at height? Give three answers.

13 / 50

What is the organisation 'The Samaritans' ?

14 / 50

Which animal is the most likely carrier of Weil' s disease (leptospirosis) on construction sites?

15 / 50

What is the maximum vertical height that a fixed ladder can be climbed, before an intermediate landing place is required?

17.22 img 1

16 / 50

What should a worker do if they have been asked to build a mobile access tower but they haven't had any training?

17 / 50

Which two of the following factors must be considered when providing first-aid facilities on site?

18 / 50

Which two of these activities are likely to need a hot-work permit?

19 / 50

When do you need to check tools and equipment for damage?

20 / 50

Where must the number of people who may be carried in a passenger hoist on site be displayed?

21 / 50

In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?

22 / 50

Under the requirements of the Work at Height Regulations, what must the minimum width of a working platform be?

23 / 50

A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, what must you ensure about the inflation pump?

24 / 50

Which of the following best describes the purpose of personal fall prevention equipment?

25 / 50

If there is a fatal accident or a reportable dangerous occurrence on site, when must the Health and Safety Executive (HSE) be informed?

26 / 50

What is the main danger of leaving someone who has fallen suspended in a harness for too long?

27 / 50

You are about to start a job. How will you know if you need a permit to work?

28 / 50

When is it advisable to take precautions to prevent people, plant or materials falling into an excavation?

29 / 50

What must happen if a prohibition notice is issued by an inspector of the Health and Safety Executive (HSE) or Local Authority?

30 / 50

What must edge protection be designed to do?

31 / 50

What does a hot-work permit allow you to do?

32 / 50

What do the initials HAVS stand for?

33 / 50

Under the Construction (Design and Management) Regulations 2015, which of the following must be in place before demolition work can start?

34 / 50

How should access be controlled if people are working in a riser shaft?

35 / 50

A worker is taking medication which could affect their health and safety in the workplace, and that of others. What should they do?

36 / 50

A mobile crane is lifting a load but the load is about to hit something. What should you do?

37 / 50

What is the main hazard associated with the movement of plant and machinery around site?

38 / 50

Which material or substance is most likely to give off hazardous vapour?

39 / 50

Why may a young person be more at risk of having an accident?

40 / 50

How is it possible to tell that a product is hazardous?

41 / 50

Following a scaffold inspection under the Work at Height Regulations, how soon must a report be given to the person on whose behalf the inspection was made?

42 / 50

What is the purpose of using a permit to work system?

43 / 50

How long must you keep inspection records under the Construction (Design and Management) Regulations 2015?

44 / 50

At what decibel (dBA) level does it become mandatory for an employer to establish hearing protection zones?

45 / 50

What is the best way for a supervisor or manager to make sure that the operatives doing a job have fully understood a method statement?

46 / 50

Which sign is a warning about high-voltage electricity?

10.27

47 / 50

Why is it important that hazards are identified?

48 / 50

Under the Construction (Design and Management) Regulations 2015, when the contractor sets a person to work on a construction site, what must they ensure that person has, or be in the process of, obtaining?

49 / 50

Which sign is categorised as a warning sign?

10.25

50 / 50

You witness a serious accident on site. What immediate action should you take? Give two answers

Your score is

The average score is 96%

Exit

How was the test? Please Submit your Rating and give a feedback!

Related Practice Tests

Leave a Reply

Your email address will not be published. Required fields are marked *