CSS Exam Info
Home » CSCS Mock Test » Specialists Test » Supervisory » CSCS Supervisor Practice Test 5
HS&E TEST
CSCS Supervisor Practice Test 5
1 / 50
Which of the following is a fall-arrest system?
2 / 50
Which one of the following statements about mental health is true?
3 / 50
When do the Work at Height Regulations require a working platform to be inspected by a competent person?
4 / 50
Why is it important to report near miss incidents on site?
5 / 50
Which two of these activities are likely to need a hot-work permit?
6 / 50
What does the following sign mean?
7 / 50
What should you do if you notice that operatives working above a safety net are dropping off-cuts of material and other debris into the net?
8 / 50
Why is methane gas dangerous in confined spaces? Give two answers
9 / 50
What is the primary use for a spill kit?
10 / 50
What is the best way for a supervisor or manager to make sure that the operatives doing a job have fully understood a method statement?
11 / 50
In which one of the following situations is it safer for a worker to speak to someone operating mobile plant?
12 / 50
What is the best way to limit exposure to dust when using a power tool?
13 / 50
Which of the following precautions should be taken to prevent a dumper that is tipping material into an excavation from falling into it?
14 / 50
Under the requirements of the Work at Height Regulations, what must the minimum width of a working platform be?
15 / 50
Which two of the following factors must be considered when providing first-aid facilities on site?
16 / 50
On the site electrical distribution system, which colour plug indicates a 400-volt supply?
17 / 50
What danger is created by excessive oxygen in a confined space?
18 / 50
What is the main risk to this worker, wearing only these items of personal protective equipment (PPE)?
19 / 50
What is the purpose of using a permit to work system?
20 / 50
Which of the following best describes the purpose of personal fall prevention equipment?
21 / 50
Which sign is a warning about high-voltage electricity?
22 / 50
What should you do if you find a ladder that is damaged?
23 / 50
If a scaffold is not complete, which of the following actions should be taken by the supervisor?
24 / 50
When planning possible work in a confined space, what should be the first consideration?
25 / 50
Which of the following is a significant hazard when excavating alongside a building or structure?
26 / 50
Following a scaffold inspection under the Work at Height Regulations, how soon must a report be given to the person on whose behalf the inspection was made?
27 / 50
A mobile crane is lifting a load but the load is about to hit something. What should you do?
28 / 50
When should guard-rails be fitted to a working platform?
29 / 50
When is it advisable to take precautions to prevent people, plant or materials falling into an excavation?
30 / 50
What is the minimum height of the main guard-rail on a scaffold?
31 / 50
From a safety point of view, which of the following should be considered first when deciding on the number and location of access and egress points on a site?
32 / 50
In considering what measures to take to protect workers against risks to their health and safety, when should personal protective equipment (PPE) be considered?
33 / 50
Which one of the following situations would require a rescue plan?
34 / 50
When putting people to work above public areas, what should be your first consideration?
35 / 50
Which piece of equipment is used with a cable avoidance tool (CAT) to detect cables?
36 / 50
What is the advantage of using safety nets rather than a harness and fall-arrest lanyard?
37 / 50
If you need to stack materials on a working platform, what is the best way to stop them falling over the toe-board?
38 / 50
Before allowing a lifting operation to be carried out, where should you ensure that the sequence of operations is recorded to enable a safe lift?
39 / 50
If there is a fatal accident or a reportable dangerous occurrence on site, when must the Health and Safety Executive (HSE) be informed?
40 / 50
Workers are on foot close to moving plant, which one of the following is true?
41 / 50
Which requirement must be met before operating a power tool?
42 / 50
Under the Construction (Design and Management) Regulations 2015, where would you find the arrangements for managing health and safety for the project you are working on?
43 / 50
What must happen if a prohibition notice is issued by an inspector of the Health and Safety Executive (HSE) or Local Authority?
44 / 50
When do you need to check tools and equipment for damage?
45 / 50
Where should an emergency escape route take you to?
46 / 50
A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, what must you ensure about the inflation pump?
47 / 50
If someone is injured at work, who should record it in the accident book?
48 / 50
On a scaffold, what must be the largest unprotected gap between any guard-rail, toe-board, barrier or other similar means of protection?
49 / 50
Good quality personal protective equipment (PPE) will be marked with which letter or letters?
50 / 50
Why should a residual current device (RCD) be used with 230 volt tools?
Your score is
The average score is 79%
Restart quiz Exit
How was the test? Please Submit your Rating and give a feedback!
Your email address will not be published. Required fields are marked *
Δ