1 / 50

How can excessive noise levels affect your hearing? Give two answers.

2 / 50

What danger is created by excessive oxygen in a confined space?

3 / 50

Who should check a ladder before it is used?

4 / 50

Who should you inform if someone tells you that they have work-related hand-arm vibration syndrome (HAVS)?

5 / 50

If you need to wear a full body harness and you have not used one before, what should you do?

6 / 50

When do the Work at Height Regulations require a working platform to be inspected by a competent person?

7 / 50

What is regarded as the last resort in the hierarchy of control for operatives' safety when working at height?

8 / 50

What action should shift workers take at work if they are taking time-dependent medication, such as insulin?

9 / 50

A mobile access tower must not be used on what surface?

10 / 50

What should you do if you see this label on a container or packaging?

for 10.7

11 / 50

Why is it considered poor practice to store batteries loose in a tool bag?

12 / 50

Which of the following is a recognised control measure when reversing a vehicle?

13 / 50

What is the maximum vertical height that a fixed ladder can be climbed, before an intermediate landing place is required?

17.22 img 1

14 / 50

Under the Construction (Design and Management) Regulations 2015, when the contractor sets a person to work on a construction site, what must they ensure that person has, or be in the process of, obtaining?

15 / 50

The effects of mental health issues at work can be managed by what?

16 / 50

Which of the following does not have to be recorded in the accident book?

17 / 50

What should you do if you are in a deep trench and you start to feel dizzy?

18 / 50

What does this sign mean?

for 10.11

19 / 50

What does the proactive monitoring of health and safety procedures involve?

20 / 50

What should you do if you need to carry a load down a steep slope?

21 / 50

Which one of the following describes the role of a vehicle marshaller?

22 / 50

What illness are you most likely to develop, if you breathe in dust and fumes over long periods of time?

23 / 50

What is the correct way to climb a ladder?

24 / 50

Following a scaffold inspection under the Work at Height Regulations, how soon must a report be given to the person on whose behalf the inspection was made?

25 / 50

What should be included in a method statement for working at height? Give three answers.

26 / 50

When must your employer provide you with personal protective equipment (PPE)?

27 / 50

What is the purpose of using a permit to work system?

28 / 50

On a scaffold, what must be the largest unprotected gap between any guard-rail, toe-board, barrier or other similar means of protection?

29 / 50

What is the best way for a supervisor or manager to make sure that the operatives doing a job have fully understood a method statement?

30 / 50

Which of the following is the safest method of accessing a mobile access tower?

31 / 50

What is the advantage of using safety nets rather than a harness and fall-arrest lanyard?

32 / 50

What is your least reliable source of information when assessing the level of vibration from a powered hand tool?

33 / 50

What should you do if the guard is missing from a power tool?

34 / 50

In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?

35 / 50

A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, what must you ensure about the inflation pump?

36 / 50

What is hand-arm vibration syndrome (HAVS)?

37 / 50

In what situation are you most likely to catch Weil's disease (leptospirosis)?

38 / 50

Ideally, where should a safety net be rigged?

39 / 50

When is the only time that you do not need to wear head protection on site?

40 / 50

The ground has become muddy on site. What could be done to prevent the ground becoming slippery?

41 / 50

Exposure to asbestos fibres may result in which illness?

42 / 50

Before allowing a lifting operation to be carried out, where should you ensure that the sequence of operations is recorded to enable a safe lift?

43 / 50

To reduce the risk of overturning and accidents when not in use, how should earth moving vehicles be parked?

44 / 50

What does it mean if there is frost around the valve on a liquefied petroleum gas (LPG) cylinder?

45 / 50

When does an employer have to prepare a written health and safety policy?

46 / 50

What must happen if a prohibition notice is issued by an inspector of the Health and Safety Executive (HSE) or Local Authority?

47 / 50

What is the main risk to this worker, wearing only these items of personal protective equipment (PPE)?

Screenshot 2024 0417 222525 refined

48 / 50

Why should construction materials be recycled?

49 / 50

What type of work is most likely to result in fatigue?

50 / 50

Under the Construction (Design and Management) Regulations 2015, what must be provided before construction work starts, and then maintained until the end of the project?

Your score is

The average score is 93%

Exit

How was the test? Please submit your Rating and give feedback!

Related Practice Tests

Leave a Reply

Your email address will not be published. Required fields are marked *