CSS Exam Info

CSCS Supervisor Practice Test 5

0 votes, 0 avg
close report window

Report a question

You cannot submit an empty report. Please add some details.
tail spin

HS&E TEST

cscs supervisor mock test 5

CSCS Supervisor Practice Test 5

1 / 50

The significant findings of risk assessments must be recorded when how many people are employed?

2 / 50

If someone is injured on site, where should this be recorded?

3 / 50

If you need to stack materials on a working platform, what is the best way to stop them falling over the toe-board?

4 / 50

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

5 / 50

Why must a residual current device (RCD) be used in conjunction with 230-volt electrical equipment?

6 / 50

What are the minimum facilities that must be provided on site for washing your hands?

7 / 50

What does this sign mean?

10.26

8 / 50

What is the maximum vertical height that a fixed ladder can be climbed, before an intermediate landing place is required?

17.22 img 1

9 / 50

Which two things should workers be briefed about when starting work on site for the first time?

10 / 50

Following a scaffold inspection under the Work at Height Regulations, how soon must a report be given to the person on whose behalf the inspection was made?

11 / 50

What must happen if a prohibition notice is issued by an inspector of the Health and Safety Executive (HSE) or Local Authority?

12 / 50

What is the main objective of carrying out an accident investigation?

13 / 50

What two things are important for the use of manual handling lifting aids?

14 / 50

What does a hot-work permit allow you to do?

15 / 50

What is the purpose of the health and safety file that is handed to the client at the end of the project?

16 / 50

What is the main danger of leaving someone who has fallen suspended in a harness for too long?

17 / 50

Where should an emergency escape route take you to?

18 / 50

Why is it important that hazards are identified?

19 / 50

What does the term lower exposure action value (80 decibels (dBA)) mean, when referring to noise?

20 / 50

In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?

21 / 50

Which requirement must be met before operating a power tool?

22 / 50

Under the Construction (Design and Management) Regulations 2015, what must be provided before construction work starts, and then maintained until the end of the project?

23 / 50

What is the minimum height of the main guard-rail on a scaffold?

17.5 img

24 / 50

What should be used to protect passers-by from getting arc eye when electric welding is about to start on your site?

25 / 50

What danger is created by excessive oxygen in a confined space?

26 / 50

What does this sign mean?

10.23

27 / 50

Before allowing a lifting operation to be carried out, where should you ensure that the sequence of operations is recorded to enable a safe lift?

28 / 50

What is the organisation 'The Samaritans' ?

29 / 50

Who should you inform if someone tells you that they have work-related hand-arm vibration syndrome (HAVS)?

30 / 50

Ideally, where should a safety net be rigged?

31 / 50

Which of the following should be the first consideration if you need to use a hazardous substance?

32 / 50

On a scaffold, what must be the largest unprotected gap between any guard-rail, toe-board, barrier or other similar means of protection?

33 / 50

Which one of the following is true of repeated exposure to small doses of dust?

34 / 50

When is it advisable to take precautions to prevent people, plant or materials falling into an excavation?

35 / 50

You have to use a new substance for the first time and need to carry out a COSHH assessment. What are the two main things you will need?

36 / 50

What do the initials HAVS stand for?

37 / 50

What are two possible consequences for employers of not taking measures to prevent accidents and ill health at work?

38 / 50

Why may a young person be more at risk of having an accident?

39 / 50

How could a site worker check if the residual current device (RCD) through which a 230-volt hand tool is connected to the supply is working correctly?

40 / 50

Which of the following precautions should be taken to prevent a dumper that is tipping material into an excavation from falling into it?

41 / 50

What is the primary use for a spill kit?

42 / 50

Under the Construction (Design and Management) Regulations 2015, which of the following must be in place before demolition work can start?

43 / 50

What is the purpose of using a permit to work system?

44 / 50

Why is methane gas dangerous in confined spaces? Give two answers

45 / 50

A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, what must you ensure about the inflation pump?

46 / 50

Why is it important to report near miss incidents on site?

47 / 50

Which of these is the most accurate way to confirm the exact location of buried services?

48 / 50

From a safety point of view, which of the following should be considered first when deciding on the number and location of access and egress points on a site?

49 / 50

What should a worker do if they have been asked to build a mobile access tower but they haven't had any training?

50 / 50

Which of the following is a fall-arrest system?

Your score is

The average score is 75%

Exit

How was the test? Please Submit your Rating and give a feedback!

Related Practice Tests

Leave a Reply

Your email address will not be published. Required fields are marked *