CSCS Supervisor Practice Test 5

1 / 50

The Beaufort Scale is important when working at height externally. What does it measure?

2 / 50

Which material or substance is most likely to give off hazardous vapour?

3 / 50

What should you do if you notice that operatives working above a safety net are dropping off-cuts of material and other debris into the net?

4 / 50

Which of the following could ignite flammable vapours? Select two answers.

5 / 50

What is regarded as the last resort in the hierarchy of control for operatives' safety when working at height?

6 / 50

What is the maximum unprotected gap allowed between any guard-rail, toe board, barrier or other similar means of protection on a scaffold?

17.70 img 1

7 / 50

Why is it dangerous to use inflatable airbags for fall arrest if they are too big for the area to be protected?

8 / 50

A worker is taking medication which could affect their health and safety in the workplace, and that of others. What should they do?

9 / 50

Which one of the following groups needs to be aware of emergency procedures on site?

10 / 50

What is the purpose of using a permit to work system?

11 / 50

You are in a deep trench. A lorry backs up to the trench and the engine is left running. What should you do?

12 / 50

In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?

13 / 50

Exposure to which of the following is unlikely to result in lung disease?

14 / 50

Which requirement must be met before operating a power tool?

15 / 50

What should you do if the head on your hammer becomes loose?

16 / 50

What should you do if you find a ladder that is damaged?

17 / 50

Good quality personal protective equipment (PPE) will be marked with which letter or letters?

18 / 50

On the site electrical distribution system, which colour plug indicates a 400-volt supply?

19 / 50

What does the term lower exposure action value (80 decibels (dBA)) mean, when referring to noise?

20 / 50

Which two of the following will help you to find out about the site emergency procedures and emergency telephone numbers?

21 / 50

Before allowing a lifting operation to be carried out, where should you ensure that the sequence of operations is recorded to enable a safe lift?

22 / 50

What should be done with waste concrete and washout water?

23 / 50

Noise levels may be a problem if you have to raise your voice to be heard by someone standing how far away?

Image for Q15

24 / 50

The significant findings of risk assessments must be recorded when how many people are employed?

25 / 50

When do the Work at Height Regulations require a working platform to be inspected by a competent person?

26 / 50

What does this sign mean?

10.26

27 / 50

Which one of the following is true of repeated exposure to small doses of dust?

28 / 50

A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, what must you ensure about the inflation pump?

29 / 50

How long must you keep inspection records under the Construction (Design and Management) Regulations 2015?

30 / 50

What does this sign mean?

10.24 removebg preview

31 / 50

What piece of personal protective equipment (PPE) should be worn on sites where there is a risk of falling objects?

32 / 50

Which sign is categorised as a warning sign?

10.25

33 / 50

You have to use a new substance for the first time and need to carry out a COSHH assessment. What are the two main things you will need?

34 / 50

If someone is injured at work, who should record it in the accident book?

35 / 50

Why is it important that hazards are identified?

36 / 50

Under the Construction (Design and Management) Regulations 2015, what must be provided before construction work starts, and then maintained until the end of the project?

37 / 50

What are the minimum facilities that must be provided on site for washing your hands?

38 / 50

Why is it important to report near miss incidents on site?

39 / 50

At what decibel (dBA) level does it become mandatory for an employer to establish hearing protection zones?

40 / 50

Which of the following is not true when using podium steps?

41 / 50

What is your least reliable source of information when assessing the level of vibration from a powered hand tool?

42 / 50

What is the purpose of the health and safety file that is handed to the client at the end of the project?

43 / 50

What is the primary use for a spill kit?

44 / 50

What is the maximum vertical height that a fixed ladder can be climbed, before an intermediate landing place is required?

17.22 img 1

45 / 50

Which animal is the most likely carrier of Weil' s disease (leptospirosis) on construction sites?

46 / 50

What regulation contains details of the welfare facilities that must be provided on a construction site?

47 / 50

In the context of a risk assessment, what does the term risk mean?

48 / 50

In deciding what control measures to take, following a risk assessment that has revealed a risk, what measure should you always consider first?

49 / 50

Workers are on foot close to moving plant, which one of the following is true?

50 / 50

Which of the following do you not need to do to ensure that someone's mask works?

Your score is

The average score is 75%

Exit