The Beaufort Scale is important when working at height externally. What does it measure?
2 / 50
Which material or substance is most likely to give off hazardous vapour?
3 / 50
What should you do if you notice that operatives working above a safety net are dropping off-cuts of material and other debris into the net?
4 / 50
Which of the following could ignite flammable vapours? Select two answers.
5 / 50
What is regarded as the last resort in the hierarchy of control for operatives' safety when working at height?
6 / 50
What is the maximum unprotected gap allowed between any guard-rail, toe board, barrier or other similar means of protection on a scaffold?
7 / 50
Why is it dangerous to use inflatable airbags for fall arrest if they are too big for the area to be protected?
8 / 50
A worker is taking medication which could affect their health and safety in the workplace, and that of others. What should they do?
9 / 50
Which one of the following groups needs to be aware of emergency procedures on site?
10 / 50
What is the purpose of using a permit to work system?
11 / 50
You are in a deep trench. A lorry backs up to the trench and the engine is left running. What should you do?
12 / 50
In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?
13 / 50
Exposure to which of the following is unlikely to result in lung disease?
14 / 50
Which requirement must be met before operating a power tool?
15 / 50
What should you do if the head on your hammer becomes loose?
16 / 50
What should you do if you find a ladder that is damaged?
17 / 50
Good quality personal protective equipment (PPE) will be marked with which letter or letters?
18 / 50
On the site electrical distribution system, which colour plug indicates a 400-volt supply?
19 / 50
What does the term lower exposure action value (80 decibels (dBA)) mean, when referring to noise?
20 / 50
Which two of the following will help you to find out about the site emergency procedures and emergency telephone numbers?
21 / 50
Before allowing a lifting operation to be carried out, where should you ensure that the sequence of operations is recorded to enable a safe lift?
22 / 50
What should be done with waste concrete and washout water?
23 / 50
Noise levels may be a problem if you have to raise your voice to be heard by someone standing how far away?
24 / 50
The significant findings of risk assessments must be recorded when how many people are employed?
25 / 50
When do the Work at Height Regulations require a working platform to be inspected by a competent person?
26 / 50
What does this sign mean?
27 / 50
Which one of the following is true of repeated exposure to small doses of dust?
28 / 50
A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, what must you ensure about the inflation pump?
29 / 50
How long must you keep inspection records under the Construction (Design and Management) Regulations 2015?
30 / 50
31 / 50
What piece of personal protective equipment (PPE) should be worn on sites where there is a risk of falling objects?
32 / 50
Which sign is categorised as a warning sign?
33 / 50
You have to use a new substance for the first time and need to carry out a COSHH assessment. What are the two main things you will need?
34 / 50
If someone is injured at work, who should record it in the accident book?
35 / 50
Why is it important that hazards are identified?
36 / 50
Under the Construction (Design and Management) Regulations 2015, what must be provided before construction work starts, and then maintained until the end of the project?
37 / 50
What are the minimum facilities that must be provided on site for washing your hands?
38 / 50
Why is it important to report near miss incidents on site?
39 / 50
At what decibel (dBA) level does it become mandatory for an employer to establish hearing protection zones?
40 / 50
Which of the following is not true when using podium steps?
41 / 50
What is your least reliable source of information when assessing the level of vibration from a powered hand tool?
42 / 50
What is the purpose of the health and safety file that is handed to the client at the end of the project?
43 / 50
What is the primary use for a spill kit?
44 / 50
What is the maximum vertical height that a fixed ladder can be climbed, before an intermediate landing place is required?
45 / 50
Which animal is the most likely carrier of Weil' s disease (leptospirosis) on construction sites?
46 / 50
What regulation contains details of the welfare facilities that must be provided on a construction site?
47 / 50
In the context of a risk assessment, what does the term risk mean?
48 / 50
In deciding what control measures to take, following a risk assessment that has revealed a risk, what measure should you always consider first?
49 / 50
Workers are on foot close to moving plant, which one of the following is true?
50 / 50
Which of the following do you not need to do to ensure that someone's mask works?
Your score is
The average score is 75%
Restart quiz Exit
How was the test? Please Submit your Rating and give a feedback!
Your email address will not be published. Required fields are marked *
Δ