CSCS Supervisor Practice Test 2

1 / 50

How long must you keep inspection records under the Construction (Design and Management) Regulations 2015?

2 / 50

If you have been given a dust mask to protect you against hazardous fumes, what should you do?

3 / 50

At what decibel (dBA) level does it become mandatory for an employer to establish hearing protection zones?

4 / 50

What is the most important consideration when wearing respiratory protective equipment (RPE)?

5 / 50

Why may a young person be more at risk of having an accident?

6 / 50

When the Construction (Design and Management) Regulations 2015 apply, what must be in place before construction work begins?

7 / 50

What is the correct way to climb a ladder?

8 / 50

What should be the capacity of a spillage bund around a fuel storage tank, in addition to the volume of the tank?

9 / 50

During excavation work, some interesting old coins are found in the loosened soil. What is the most appropriate action?

10 / 50

What system is a method of dust control?

11 / 50

If you hear a ringing sound in your ears after working with noisy equipment, what does this mean?

12 / 50

What is the best way for a supervisor or manager to make sure that the operatives doing a job have fully understood a method statement?

13 / 50

How should access be controlled if people are working in a riser shaft?

14 / 50

What should be included in a method statement for working at height? Give three answers.

15 / 50

What should all risk assessments identify?

16 / 50

Where should liquefied petroleum gas (LPG) cylinders supplying an appliance in a site cabin be positioned?

17 / 50

How can excessive noise levels affect your hearing? Give two answers.

18 / 50

Which of the following is the safest method of accessing a mobile access tower?

19 / 50

When do the Work at Height Regulations require a working platform to be inspected by a competent person?

20 / 50

When planning possible work in a confined space, what should be the first consideration?

21 / 50

When does an employer have to prepare a written health and safety policy?

22 / 50

What must edge protection be designed to do?

23 / 50

Exposure to asbestos fibres may result in which illness?

24 / 50

Who is responsible for managing health and safety on site?

25 / 50

Which of the following is a recognised control measure when reversing a vehicle?

26 / 50

Under the Construction (Design and Management) Regulations 2015, where would you find the arrangements for managing health and safety for the project you are working on?

27 / 50

A mobile access tower must not be used on what surface?

28 / 50

Which of the following is a significant hazard when excavating alongside a building or structure?

29 / 50

Who should you inform if someone tells you that they have work-related hand-arm vibration syndrome (HAVS)?

30 / 50

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

31 / 50

What does this sign mean?

for 10.9

32 / 50

Which of the following is the correct order of signs with their categories?

10.12

33 / 50

How can the safe load rating for a scaffold platform be identified?

34 / 50

How can asbestos be correctly identified?

35 / 50

When putting people to work above public areas, what should be your first consideration?

36 / 50

What does it mean if you have to twist or turn your body when you lift and place a load?

37 / 50

Under the Construction (Design and Management) Regulations 2015, which two of the following must you ensure workers have received before they start working on site?

38 / 50

When is it advisable to take precautions to prevent people, plant or materials falling into an excavation?

39 / 50

From a safety point of view, which of the following should be considered first when deciding on the number and location of access and egress points on a site?

40 / 50

What is regarded as the last resort in the hierarchy of control for operatives' safety when working at height?

41 / 50

Under the Construction (Design and Management) Regulations 2015, when the contractor sets a person to work on a construction site, what must they ensure that person has, or be in the process of, obtaining?

42 / 50

What is the main danger of leaving someone who has fallen suspended in a harness for too long?

43 / 50

What regulation contains details of the welfare facilities that must be provided on a construction site?

44 / 50

Under the Construction (Design and Management) Regulations 2015, which of the following must be in place before demolition work can start?

45 / 50

In what situation are you most likely to catch Weil's disease (leptospirosis)?

46 / 50

Which of the following is a fall-arrest system?

47 / 50

In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?

48 / 50

What does this sign mean?

for 10.11

49 / 50

What should you do if you are in a deep trench and you start to feel dizzy?

50 / 50

What does this sign mean?

for 10.10

Your score is

The average score is 89%

Exit

How was the test? Please submit your Rating and give feedback!

Related Practice Tests

Leave a Reply

Your email address will not be published. Required fields are marked *