CSS Exam Info

0 votes, 0 avg

Specialists Test

refrigeration cscs mock test

HVACR - Refrigeration and Air Conditioning

1 / 46

If you are working where welding is being carried out, what should be provided to protect you from welding flash?

2 / 46

If refrigerant gases are released into a closed room in a building, what would they do?

3 / 46

What must be clearly marked on all lifting equipment?

4 / 46

What should you do if you need additional temporary wiring for your power tools whilst working on site?

5 / 46

If you find a coloured wire sticking out of an electrical plug what is the correct action to take?

6 / 46

Which item of electrical equipment does not require portable appliance testing?

7 / 46

Which of these statements is true in relation to the safe working load (SWL) of lifting equipment?

8 / 46

If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?

9 / 46

How should extension leads in use on site be positioned?

10 / 46

When using a blowtorch or brazing equipment to joint copper tube and fittings in a property, how should a fire extinguisher be made available?

11 / 46

What is the first thing that should be done when a new refrigeration system has been installed?

12 / 46

You have been asked to install a number of ceiling-mounted air-conditioning units in a large, open-plan area, which has a good floor. What is the best way to access the work area?

13 / 46

When assembling a mobile tower what major hazard must you be aware of?

14 / 46

What should you ensure when pressure testing with nitrogen?

15 / 46

When planning a lifting operation how should the sequence of operations to enable a safe lift be confirmed?

16 / 46

Which of these items of personal protective equipment (PPE) is designed to protect against infrared radiation damage to the eyes during flame cutting or welding?

17 / 46

When working in a riser, how should access be controlled?

18 / 46

When handling refrigerant gases, what personal protective equipment (PPE) should you wear as a minimum?

19 / 46

What should you establish before entering a cold room?

20 / 46

Which two of the following are essential safety checks that need to be carried out before using oxyacetylene equipment?

21 / 46

You have to carry out a job, over a few days, on the flat roof of a two-storey building, about 1 m from the edge of the roof, which has a low parapet. How should you reduce your risk of falling?

22 / 46

When using a van to transport a refrigerant bottle, how should it be carried?

23 / 46

What is the recommended maximum height for a free-standing mobile tower?

24 / 46

When working on refrigeration systems containing hydrocarbon (HC) gases, what particular danger needs to be considered?

25 / 46

What should be done before a mobile tower is moved?

26 / 46

What must be done first before any roof work is carried out?

27 / 46

When repairing an electrically driven compressor, what is the minimum safe method of isolation?

28 / 46

What safety devices should be fitted between the pipes and the gauges of oxyacetylene brazing equipment?

29 / 46

Which of these statements is true of the water in water-cooled systems?

30 / 46

What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?

31 / 46

If you have to drill through a wall panel that you suspect contains an asbestos material, what should you do?

32 / 46

How should you position the exhaust of an engine-driven generator that has to be run inside a building?

33 / 46

When a new piece of plant has been installed but has not been commissioned, how should it be left?

34 / 46

How should cylinders (full or empty) that contain liquefied petroleum gas (LPG) or acetylene be stored on site?

35 / 46

Why must you never use oxygen when pressure testing?

36 / 46

If you are carrying out hot works with a blowtorch, when should you stop using it?

37 / 46

When a refrigerant leak is reported in a closed area, what should you do first before entering the area?

38 / 46

How should you position the bottles when using oxyacetylene brazing equipment?

39 / 46

What should you do when it is necessary to cut into an existing refrigerant pipe?

40 / 46

What is edge protection designed to do?

41 / 46

What must you ensure before using a ladder?

42 / 46

Where is the safest place to store refrigerant cylinders when they are not in use?

43 / 46

Why is it essential to take great care when handling oxygen cylinders?

44 / 46

Who is permitted to install, service or maintain systems that contain or are designed to contain refrigerant gases?

45 / 46

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

46 / 46

When positioning and erecting a stepladder, which of the following is essential for its safe use?

Your score is

The average score is 83%

Exit

How was the test? Please Submit your Rating and give us a feedback!

Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.

We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.

Leave a Reply