1 / 48

When using oxyacetylene brazing equipment, how should the bottles be positioned?

2 / 48

What is the method of checking for leaks after connecting a liquefied petroleum gas (LPG) regulator to the bottle?

3 / 48

Which two of the following are essential safety checks to be carried out before using oxyacetylene equipment?

4 / 48

While working on your own and tracing pipework in a building, you notice that the pipes enter a service duct. What should you do?

5 / 48

What should you ensure when using an electrically powered threading machine?

6 / 48

What must be done first before any roof work is carried out?

7 / 48

Who should carry out pressure testing on pipework or vessels?

8 / 48

What is the main hazard associated with flame-cutting and welding?

9 / 48

What must you ensure before using a ladder?

10 / 48

What is the most likely risk of injury when cutting a pipe with hand-operated pipe cutters?

11 / 48

What should you do if you need additional temporary wiring for your power tools whilst working on site?

12 / 48

When planning a lifting operation, how should the sequence of operations to enable a safe lift be confirmed?

13 / 48

Why is it important to know the difference between propane and butane equipment?

14 / 48

What must be clearly marked on all lifting equipment?

15 / 48

Who should be present during the pressure testing of pipework or vessels?

16 / 48

If you are working where welding is being carried out, what should be provided to protect you from welding flash?

17 / 48

When should you stop carrying out hot works?

18 / 48

When assembling a mobile tower what major hazard must you be aware of?

19 / 48

Why is it essential to take great care when handling oxygen cylinders?

20 / 48

What should be done before a mobile tower is moved?

21 / 48

Where should acetylene gas-welding bottles be stored when they are not in use?

22 / 48

What is the recommended maximum height for a free-standing mobile tower?

23 / 48

The use of oxyacetylene equipment is not recommended for which jointing method?

24 / 48

When a new piece of plant has been installed but has not been commissioned, how should it be left?

25 / 48

Which item of electrical equipment does not require portable appliance testing?

26 / 48

Which of these statements is true in relation to the safe working load (SWL) of lifting equipment?

27 / 48

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

28 / 48

Which item of personal protective equipment (PPE) is designed to protect against infrared radiation damage to the eyes during flame cutting or welding?

29 / 48

What is the colour of an acetylene cylinder?

30 / 48

Which two of these activities are likely to need a hot-work permit?

31 / 48

If you find a coloured wire sticking out of an electrical plug what is the correct action to take?

32 / 48

When do you need to wear eye protection while drilling through a wall?

33 / 48

Which of the following statements is true?

34 / 48

What should you do when using a blowtorch near to flexible pipe lagging?

35 / 48

What should you do when using pipe-freezing equipment to isolate a damaged section of pipe?

36 / 48

What guarding is required when a pipe threading machine is in use?

37 / 48

Apart from the cylinders used in gas-powered forklift trucks, why should liquefied petroleum gas (LPG) cylinders never be placed on their side during use?

38 / 48

How should you position the exhaust of an engine-driven generator that has to be run inside a building?

39 / 48

When using a blowtorch near to timber, what should you do?

40 / 48

If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?

41 / 48

What is edge protection designed to do?

42 / 48

Who is allowed to install natural gas pipework?

43 / 48

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

44 / 48

When positioning and erecting a stepladder, which of the following is essential for its safe use?

45 / 48

How should extension lead in use on site be positioned?

46 / 48

When working in a riser, how should access be controlled?

47 / 48

What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?

48 / 48

If you are asked to install high-level ductwork from a platform that has no edge protection and is located above an open stairwell, what should you do?

Your score is

The average score is 76%

Exit

How was the test? Please Submit your Rating and give us a feedback!

Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.

We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.

Leave a Reply

Your email address will not be published. Required fields are marked *