CSS Exam Info

0 votes, 0 avg

Specialists Test

cscs pipefitter mock test

HVACR - Pipefitting and Welding

1 / 48

When do you need to wear eye protection while drilling through a wall?

2 / 48

Which of these statements is true in relation to the safe working load (SWL) of lifting equipment?

3 / 48

What guarding is required when a pipe threading machine is in use?

4 / 48

Why is it essential to take great care when handling oxygen cylinders?

5 / 48

What must you ensure before using a ladder?

6 / 48

Who should carry out pressure testing on pipework or vessels?

7 / 48

What is edge protection designed to do?

8 / 48

Which of the following statements is true?

9 / 48

What is the method of checking for leaks after connecting a liquefied petroleum gas (LPG) regulator to the bottle?

10 / 48

While working on your own and tracing pipework in a building, you notice that the pipes enter a service duct. What should you do?

11 / 48

If you are asked to install high-level ductwork from a platform that has no edge protection and is located above an open stairwell, what should you do?

12 / 48

If you are working where welding is being carried out, what should be provided to protect you from welding flash?

13 / 48

What is the recommended maximum height for a free-standing mobile tower?

14 / 48

Which item of personal protective equipment (PPE) is designed to protect against infrared radiation damage to the eyes during flame cutting or welding?

15 / 48

How should extension lead in use on site be positioned?

16 / 48

When planning a lifting operation, how should the sequence of operations to enable a safe lift be confirmed?

17 / 48

When should you stop carrying out hot works?

18 / 48

What should you do when using a blowtorch near to flexible pipe lagging?

19 / 48

What must be clearly marked on all lifting equipment?

20 / 48

If you find a coloured wire sticking out of an electrical plug what is the correct action to take?

21 / 48

When working in a riser, how should access be controlled?

22 / 48

What must be done first before any roof work is carried out?

23 / 48

What should be done before a mobile tower is moved?

24 / 48

When a new piece of plant has been installed but has not been commissioned, how should it be left?

25 / 48

When using a blowtorch near to timber, what should you do?

26 / 48

What should you do if you need additional temporary wiring for your power tools whilst working on site?

27 / 48

What is the colour of an acetylene cylinder?

28 / 48

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

29 / 48

Which two of these activities are likely to need a hot-work permit?

30 / 48

What is the most likely risk of injury when cutting a pipe with hand-operated pipe cutters?

31 / 48

Where should acetylene gas-welding bottles be stored when they are not in use?

32 / 48

Why is it important to know the difference between propane and butane equipment?

33 / 48

When positioning and erecting a stepladder, which of the following is essential for its safe use?

34 / 48

Apart from the cylinders used in gas-powered forklift trucks, why should liquefied petroleum gas (LPG) cylinders never be placed on their side during use?

35 / 48

When assembling a mobile tower what major hazard must you be aware of?

36 / 48

What should you ensure when using an electrically powered threading machine?

37 / 48

If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?

38 / 48

How should you position the exhaust of an engine-driven generator that has to be run inside a building?

39 / 48

What should you do when using pipe-freezing equipment to isolate a damaged section of pipe?

40 / 48

When using oxyacetylene brazing equipment, how should the bottles be positioned?

41 / 48

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

42 / 48

Who is allowed to install natural gas pipework?

43 / 48

Which two of the following are essential safety checks to be carried out before using oxyacetylene equipment?

44 / 48

Who should be present during the pressure testing of pipework or vessels?

45 / 48

What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?

46 / 48

What is the main hazard associated with flame-cutting and welding?

47 / 48

Which item of electrical equipment does not require portable appliance testing?

48 / 48

The use of oxyacetylene equipment is not recommended for which jointing method?

Your score is

The average score is 87%

Exit

How was the test? Please Submit your Rating and give us a feedback!

Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.

We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.

Leave a Reply

Your email address will not be published. Required fields are marked *