What action is required if a vehicle detector on temporary traffic lights becomes defective?
2 / 52
When can you carry authorised passengers in vehicles?
3 / 52
In which two places would you find information about the distances for setting out highways signs in advance of the works under different road conditions?
4 / 52
When providing portable traffic signals on roads used by cyclists, what action should you take?
5 / 52
What should you do with materials that have to be kept on site overnight?
6 / 52
In which of the following circumstances would it not be safe to use a cherry picker for working at height?
7 / 52
What action is required where it is not possible to maintain the correct safety zone?
8 / 52
When kerbing works are being carried out, how should kerbs be taken off the vehicle?
9 / 52
What are two effects of underinflated tyres on the operation of a machine?
10 / 52
How must signs on footways be located?
11 / 52
What action is required where passing traffic may block the view of highways signs?
12 / 52
How must highway signs, lights and guarding equipment be properly secured?
13 / 52
What is the minimum traffic management required when carrying out a short-term minor maintenance job in a quiet, low-speed side road?
14 / 52
If you are driving any plant that may overturn, when must a seat belt be worn?
15 / 52
Why is it necessary to wear hi-vis clothing when working on roads?
16 / 52
What must you do before towing a trailer fitted with independent brakes?
17 / 52
Why is it not safe to use diesel to prevent asphalt sticking to the bed of lorries?
18 / 52
How often must a competent person thoroughly examine lifting equipment for lifting persons (for example, a cherry picker)?
19 / 52
What should you do if drivers approaching highway works cannot see the advance signs clearly because of poor visibility or obstructions caused by road features?
20 / 52
What is the maximum distance between the 'roadworks ahead' signs for work activities that move along the carriageway, such as sweeping, verge mowing and road lining?
21 / 52
If a safety cut-out on a machine does not operate, what should you do?
22 / 52
In which of the following circumstances can someone enter the safety zone?
23 / 52
When should you switch on the amber flashing beacon fitted to your highways vehicle?
24 / 52
Which checks should the operator of a mobile elevating work platform (MEWP) (for example, a cherry picker) carry out before using it?
25 / 52
How should you protect a portable traffic-light cable that crosses a road?
26 / 52
Which two site conditions must be met before traffic management can be reduced to the minimum requirements?
27 / 52
You are working on a dual carriageway with a 60-mph speed limit although you are not in the working space. What is the minimum standard of hi-vis clothing that you must wear?
28 / 52
What should be used to protect the public from a shallow excavation in a public footway?
29 / 52
How should portable traffic signals be assembled and placed?
30 / 52
What should you do if you are the driver of a vehicle and lose sight of the vehicle marshaller while reversing your vehicle?
31 / 52
Which is not an approved means of controlling traffic at roadworks?
32 / 52
When it is necessary to tip into an excavation, what is the preferred method of preventing the vehicle getting too close to the edge?
33 / 52
What is the correct way to dismount from the cab or driving seat of plant and vehicles?
34 / 52
What is the purpose of an on-site risk assessment?
35 / 52
What must you have before towing a compressor on the highway? Give two answers.
36 / 52
When working after dark, is mobile plant exempt from the requirement to show lights?
37 / 52
A single vehicle is being used to carry out mobile highway works during the day. What sign or symbol must be clearly displayed on or at the rear of the vehicle?
38 / 52
What action should you take if a vehicle, driven by a member of the public, enters the coned off area on a dual carriageway?
39 / 52
What must you do when getting off plant and vehicles?
40 / 52
What is not usually something to consider while undertaking a site-specific risk assessment before starting highway works?
41 / 52
Who is responsible for the security of the load on a vehicle?
42 / 52
When using lifting equipment, such as a cherry picker, lorry loader or excavator, how should you follow the indicated safe working load?
43 / 52
What should you do when leaving plant unattended?
44 / 52
What is the purpose of the safety zone?
45 / 52
When should installed highways signs and guarding equipment be inspected?
46 / 52
What must you do approximately 200 m before a site works access on a motorway?
47 / 52
You are moving or laying slabs, paving blocks or Kerbs on site. Which two of the following methods would be classed as manual handling?
48 / 52
Which of these is the safest method of operating a machine under electrical power lines when it has an extending jib or boom?
49 / 52
Where would you find information about working on a dual carriageway with a speed limit above 40 mph?
50 / 52
What action is required when a highways vehicle fitted with a direction arrow is travelling from site to site?
51 / 52
What is the main reason why temporary highways signing needs to be removed when works are completed?
52 / 52
What traffic management is required when carrying out a maintenance job on a motorway?
Your score is
The average score is 93%
Restart quiz Exit
How was the test? Please Submit your Rating and give us a feedback!
Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.
We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.
Your email address will not be published. Required fields are marked *
Δ