CSS Exam Info
Specialists Test
HVACR - Refrigeration and Air Conditioning
1 / 46
What must you ensure before using a ladder?
2 / 46
When planning a lifting operation how should the sequence of operations to enable a safe lift be confirmed?
3 / 46
What should you do if you need additional temporary wiring for your power tools whilst working on site?
4 / 46
If you have to drill through a wall panel that you suspect contains an asbestos material, what should you do?
5 / 46
How should you position the exhaust of an engine-driven generator that has to be run inside a building?
6 / 46
What should you ensure when pressure testing with nitrogen?
7 / 46
When assembling a mobile tower what major hazard must you be aware of?
8 / 46
How should extension leads in use on site be positioned?
9 / 46
If refrigerant gases are released into a closed room in a building, what would they do?
10 / 46
What is the recommended maximum height for a free-standing mobile tower?
11 / 46
What is edge protection designed to do?
12 / 46
When using a van to transport a refrigerant bottle, how should it be carried?
13 / 46
You have been asked to install a number of ceiling-mounted air-conditioning units in a large, open-plan area, which has a good floor. What is the best way to access the work area?
14 / 46
Which of these statements is true in relation to the safe working load (SWL) of lifting equipment?
15 / 46
When working in a riser, how should access be controlled?
16 / 46
When working on refrigeration systems containing hydrocarbon (HC) gases, what particular danger needs to be considered?
17 / 46
Who is permitted to install, service or maintain systems that contain or are designed to contain refrigerant gases?
18 / 46
When a refrigerant leak is reported in a closed area, what should you do first before entering the area?
19 / 46
What safety devices should be fitted between the pipes and the gauges of oxyacetylene brazing equipment?
20 / 46
Which item of electrical equipment does not require portable appliance testing?
21 / 46
When repairing an electrically driven compressor, what is the minimum safe method of isolation?
22 / 46
What should you do when it is necessary to cut into an existing refrigerant pipe?
23 / 46
Where is the safest place to store refrigerant cylinders when they are not in use?
24 / 46
How should cylinders (full or empty) that contain liquefied petroleum gas (LPG) or acetylene be stored on site?
25 / 46
If you are carrying out hot works with a blowtorch, when should you stop using it?
26 / 46
Why must you never use oxygen when pressure testing?
27 / 46
If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?
28 / 46
What is the first thing that should be done when a new refrigeration system has been installed?
29 / 46
What should you establish before entering a cold room?
30 / 46
Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?
31 / 46
How should you position the bottles when using oxyacetylene brazing equipment?
32 / 46
You have to carry out a job, over a few days, on the flat roof of a two-storey building, about 1 m from the edge of the roof, which has a low parapet. How should you reduce your risk of falling?
33 / 46
Which of these statements is true of the water in water-cooled systems?
34 / 46
What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?
35 / 46
Which of these items of personal protective equipment (PPE) is designed to protect against infrared radiation damage to the eyes during flame cutting or welding?
36 / 46
What should be done before a mobile tower is moved?
37 / 46
What must be done first before any roof work is carried out?
38 / 46
When handling refrigerant gases, what personal protective equipment (PPE) should you wear as a minimum?
39 / 46
When a new piece of plant has been installed but has not been commissioned, how should it be left?
40 / 46
When using a blowtorch or brazing equipment to joint copper tube and fittings in a property, how should a fire extinguisher be made available?
41 / 46
When positioning and erecting a stepladder, which of the following is essential for its safe use?
42 / 46
Which two of the following are essential safety checks that need to be carried out before using oxyacetylene equipment?
43 / 46
If you are working where welding is being carried out, what should be provided to protect you from welding flash?
44 / 46
What must be clearly marked on all lifting equipment?
45 / 46
Why is it essential to take great care when handling oxygen cylinders?
46 / 46
If you find a coloured wire sticking out of an electrical plug what is the correct action to take?
Your score is
The average score is 0%
Restart quiz Exit
How was the test? Please Submit your Rating and give us a feedback!
Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.
We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.
Your email address will not be published. Required fields are marked *
Δ