CSS Exam Info

0 votes, 0 avg

Specialists Test

cscs pipefitter mock test

HVACR - Pipefitting and Welding

1 / 48

Which item of electrical equipment does not require portable appliance testing?

2 / 48

When do you need to wear eye protection while drilling through a wall?

3 / 48

What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?

4 / 48

What must be done first before any roof work is carried out?

5 / 48

When positioning and erecting a stepladder, which of the following is essential for its safe use?

6 / 48

If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?

7 / 48

When planning a lifting operation, how should the sequence of operations to enable a safe lift be confirmed?

8 / 48

When should you stop carrying out hot works?

9 / 48

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

10 / 48

Why is it essential to take great care when handling oxygen cylinders?

11 / 48

Where should acetylene gas-welding bottles be stored when they are not in use?

12 / 48

Who is allowed to install natural gas pipework?

13 / 48

What is the recommended maximum height for a free-standing mobile tower?

14 / 48

How should extension lead in use on site be positioned?

15 / 48

Which two of the following are essential safety checks to be carried out before using oxyacetylene equipment?

16 / 48

While working on your own and tracing pipework in a building, you notice that the pipes enter a service duct. What should you do?

17 / 48

Which of the following statements is true?

18 / 48

If you find a coloured wire sticking out of an electrical plug what is the correct action to take?

19 / 48

What is the method of checking for leaks after connecting a liquefied petroleum gas (LPG) regulator to the bottle?

20 / 48

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

21 / 48

If you are working where welding is being carried out, what should be provided to protect you from welding flash?

22 / 48

What must be clearly marked on all lifting equipment?

23 / 48

What should you do when using a blowtorch near to flexible pipe lagging?

24 / 48

What is the main hazard associated with flame-cutting and welding?

25 / 48

What is the colour of an acetylene cylinder?

26 / 48

What should be done before a mobile tower is moved?

27 / 48

What guarding is required when a pipe threading machine is in use?

28 / 48

Which two of these activities are likely to need a hot-work permit?

29 / 48

When using oxyacetylene brazing equipment, how should the bottles be positioned?

30 / 48

Why is it important to know the difference between propane and butane equipment?

31 / 48

What should you ensure when using an electrically powered threading machine?

32 / 48

Which of these statements is true in relation to the safe working load (SWL) of lifting equipment?

33 / 48

When assembling a mobile tower what major hazard must you be aware of?

34 / 48

Who should be present during the pressure testing of pipework or vessels?

35 / 48

What is the most likely risk of injury when cutting a pipe with hand-operated pipe cutters?

36 / 48

If you are asked to install high-level ductwork from a platform that has no edge protection and is located above an open stairwell, what should you do?

37 / 48

The use of oxyacetylene equipment is not recommended for which jointing method?

38 / 48

What must you ensure before using a ladder?

39 / 48

Which item of personal protective equipment (PPE) is designed to protect against infrared radiation damage to the eyes during flame cutting or welding?

40 / 48

Apart from the cylinders used in gas-powered forklift trucks, why should liquefied petroleum gas (LPG) cylinders never be placed on their side during use?

41 / 48

When using a blowtorch near to timber, what should you do?

42 / 48

What should you do when using pipe-freezing equipment to isolate a damaged section of pipe?

43 / 48

When a new piece of plant has been installed but has not been commissioned, how should it be left?

44 / 48

Who should carry out pressure testing on pipework or vessels?

45 / 48

How should you position the exhaust of an engine-driven generator that has to be run inside a building?

46 / 48

When working in a riser, how should access be controlled?

47 / 48

What should you do if you need additional temporary wiring for your power tools whilst working on site?

48 / 48

What is edge protection designed to do?

Your score is

The average score is 92%

Exit

How was the test? Please Submit your Rating and give us a feedback!

Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.

We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.

Leave a Reply

Your email address will not be published. Required fields are marked *