CSS Exam Info
Specialists Test
HVACR - Services and Facilities Maintenance
1 / 46
Where might you find information on the safe way to maintain the services in a building?
2 / 46
Which of the following should you not do when replacing the filters in an air-conditioning system?
3 / 46
After servicing a gas boiler, what checks must you make by law?
4 / 46
Before working on electrically powered equipment, what is the procedure to make sure that the supply is dead before work starts?
5 / 46
Which type of power drill is most suitable for fixing a run of pipework outside in wet weather?
6 / 46
Before starting work on a particular piece of equipment, who or what should you consult?
7 / 46
What is the ideal temperature for legionella to breed?
8 / 46
While working on your own and tracing pipework in a building, you notice that the pipes enter a service duct. What should you do?
9 / 46
What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?
10 / 46
If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?
11 / 46
What action should you take if a natural gas leak is reported in a closed area?
12 / 46
What is used to reduce 230-volts to 110-volts on site?
13 / 46
When assembling a mobile access tower what major hazard must you be aware of?
14 / 46
What are the two main safety considerations when using oxyacetylene equipment in a confined space?
15 / 46
How should an adequate supply of breathable fresh air be provided in a confined space when breathing apparatus is not being worn?
16 / 46
When removing some panelling, you see a section of cabling with the wires showing. What should you do?
17 / 46
Which of the following actions should you take if a refrigerant leak is reported in a closed area?
18 / 46
When must a shaft or pit be securely covered or have double guard-rails and toe-boards installed?
19 / 46
When carrying out solvent welding on plastic pipework, what particular safety measure must you apply?
20 / 46
What must you ensure to prevent unauthorised access to an unoccupied plant or switchgear room?
21 / 46
How should liquefied petroleum gas (LPG) cylinders be carried to and from premises in a van?
22 / 46
What should you consider first when planning to work in a confined space?
23 / 46
Which two of the following are classed as pressure systems?
24 / 46
Who should be informed if a legionella outbreak is suspected?
25 / 46
What would you use to find out whether a wall into which you are about to drill contains an electric supply?
26 / 46
When should the use of a permit to work be considered?
27 / 46
What should you do if, when carrying out a particular task, the correct tool is not available?
28 / 46
When positioning and erecting a stepladder, which of the following is essential for its safe use?
29 / 46
Which of these statements is true in relation to the water used in cooling systems?
30 / 46
How should access to a riser be controlled?
31 / 46
How is legionella transmitted?
32 / 46
What should be the maximum temperature for a cold water supply, after it has been run for one minute?
33 / 46
What precaution should be taken to protect against lighting failure in a confined space?
34 / 46
If you arrive on site and find the mains isolator for a component is switched off, what should you do?
35 / 46
When arriving at an occupied building, who or what should you consult to find out about any asbestos in the premises before starting work?
36 / 46
What is required if there is a cooling tower on site?
37 / 46
What is the procedure for ensuring that the electrical supply is dead before replacing an electric immersion heater?
38 / 46
In the normal office environment what should be the hot water temperature at the tap furthest from the boiler, after it has been run for one minute?
39 / 46
What is required before a pressure system can be operated?
40 / 46
Which of the following is the most likely place to find legionella?
41 / 46
What must you do before adding inhibitor to a heating system?
42 / 46
Who should fit a padlock and tag to an electrical lock-out guard?
43 / 46
What colour power outlet on a portable generator would supply 230-volts?
44 / 46
What is the correct action to take if natural gas is detected in an underground service duct?
45 / 46
Why is temporary continuity bonding carried out before removing and replacing sections of metallic pipework?
46 / 46
Which two of the following should a person who is going to work alone carry out to ensure their safety?
Your score is
The average score is 0%
Restart quiz Exit
How was the test? Please Submit your Rating and give us a feedback!
Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.
We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.
Your email address will not be published. Required fields are marked *
Δ