1 / 44

What is edge protection designed to do?

2 / 44

Which type of power drill is most suitable for fixing a run of pipework outside in wet weather?

3 / 44

What is the recommended maximum height for a free-standing mobile tower?

4 / 44

What must be done first before any roof work is carried out?

5 / 44

When drilling a hole for a boiler flue outside, which type of working platform should you use?

6 / 44

What must you ensure before using a ladder?

7 / 44

During a job you may need to work below a ground-level suspended timber floor. What is the most important question you should ask?

8 / 44

What should you do when using a blowtorch near to timber?

9 / 44

When must you wear eye protection while drilling through a wall?

10 / 44

What is the safest method of transporting long lengths of copper pipe by van?

11 / 44

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

12 / 44

If you are carrying out hot works with a blowtorch, when should you stop using it?

13 / 44

The legionella bacteria that cause legionnaires' disease are most likely to be found in which of the following?

14 / 44

What is the safest way to move a cast iron boiler some distance?

15 / 44

Which of these is true in relation to the safe working load (SWL) of lifting equipment?

16 / 44

Who can solder a fitting on an isolated copper gas pipe?

17 / 44

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

18 / 44

When planning a lifting operation, how should the sequence of operations to enable a safe lift be confirmed?

19 / 44

If you find a dangerous gas fitting that is likely to cause a death or specified injury, who must be sent a formal report?

20 / 44

When assembling a mobile tower what major hazard must you be aware of?

21 / 44

How should you access a roof to install a flexible flue liner into an existing chimney?

22 / 44

How are legionella bacteria passed on to humans?

23 / 44

What should folding stepladders be used for?

24 / 44

When positioning and erecting a stepladder, which of the following is essential for its safe use?

25 / 44

What should you do when using pipe-freezing equipment to isolate a damaged section of pipe?

26 / 44

How should extension leads in-use on site be positioned?

27 / 44

What must be clearly marked on all lifting equipment?

28 / 44

Which item of electrical equipment does not require portable appliance testing?

29 / 44

What is the first thing you should do after getting on to the platform of a correctly erected mobile tower?

30 / 44

What should be done before a mobile tower is moved?

31 / 44

When a new piece of plant has been installed but has not been commissioned, how should it be left?

32 / 44

What should you do if you need additional temporary wiring for your power tools whilst working on site?

33 / 44

If you are working where welding is being carried out, what should be provided to protect you from welding flash?

34 / 44

What should you do when using a blowtorch near to flexible pipe lagging?

35 / 44

If you find a coloured wire sticking out of an electrical plug what is the correct action to take?

36 / 44

How should you position the exhaust of an engine-driven generator that has to be run inside a building?

37 / 44

What is the only circumstance where stepladders should be used?

38 / 44

Why is temporary continuity bonding carried out before removing and replacing sections of metallic pipework?

39 / 44

What personal protective equipment (PPE) should you wear when using a hammer drill to drill a 100 mm diameter hole through a brick wall?

40 / 44

What would you use to find out whether a wall into which you are about to drill contains an electric supply?

41 / 44

When carrying a ladder on a vehicle, what is the correct way of securing the ladder to the roof rack?

42 / 44

If you spill some oil on the floor and you do not have any absorbent material to clean the area, what should you do?

43 / 44

When working in a riser, how should access be controlled?

44 / 44

When using a blowtorch to joint copper tube and fittings in a domestic property, how should a fire extinguisher be made available?

Your score is

The average score is 86%

Exit

How was the test? Please Submit your Rating and give us a feedback!

Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.

We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.

Leave a Reply

Your email address will not be published. Required fields are marked *