1 / 41

What should you do when leaving mobile plant unattended?

2 / 41

What safety feature is provided by FOPS on mobile plant?

3 / 41

What should be clearly marked on all lifting gear?

4 / 41

Where should liquefied petroleum gas (LPG) cylinders be located when being used for heating or cooking in site cabins?

5 / 41

Which of the following is not generally part of a plant operator's daily pre-use check?

6 / 41

What action should you take if you discover unlabelled drums or containers on site?

7 / 41

Which of these statements is true in relation to an operator of a scissor lift?

8 / 41

What is the correct way to climb off a machine?

9 / 41

If the plant you are driving has defective brakes, what action should you take?

10 / 41

What type of fire extinguisher should not be provided where petrol or diesel is being stored?

11 / 41

What action should be taken if a wire rope sling is defective?

12 / 41

Which of the following is true in relation to the safe working load of a piece of equipment?

13 / 41

What kind of survey is required to identify asbestos prior to demolition?

14 / 41

When hinge-cutting a steel building or structure for a controlled collapse, which of the following should be the last cuts?

15 / 41

Which two of the following documents refer to the specific hazards associated with demolition work in confined spaces?

16 / 41

On site, what is the minimum distance that oxygen should be stored away from propane, butane or any other gas?

18.07 img

17 / 41

What is most likely to be caused by continual use of hand-held breakers or drills?

18 / 41

When must head and tail lights be used on mobile plant?

19 / 41

When would it be unsafe to operate a scissor lift?

20 / 41

With regard to the safe method of working, what is the most important subject of induction training for demolition operatives?

21 / 41

What is the safest method of demolishing brick or internal walls by hand?

22 / 41

When asbestos material is suspected in buildings to be demolished, what is the first priority?

23 / 41

How often should lifting accessories be thoroughly examined?

24 / 41

Which piece of equipment could a 17-year-old trainee demolition operative use unsupervised?

25 / 41

What should be obtained before carrying out the demolition cutting of fuel tanks?

26 / 41

When is it acceptable to carry passengers on a machine?

27 / 41

Which statement is true with regard to using machines?

28 / 41

If there are any doubts about a building's stability, who should a demolition contractor consult?

29 / 41

What is the most common source of high levels of lead in the blood of operatives during demolition work of an old building?

30 / 41

Which of the following would be suitable to use when cutting coated steelwork?

31 / 41

Where is the only place you will not find information about the daily checks required for mobile plant?

32 / 41

When demolishing a building in controlled sections, what is the most important consideration for the remaining structure?

33 / 41

Where would you find out the method for controlling identified hazards on a demolition project?

34 / 41

Which of the following items of personal protective equipment (PPE) provides the lowest level of protection when working in dusty conditions?

35 / 41

What should you do if you discover underground services not previously identified?

36 / 41

What do the letters SWL stand for?

37 / 41

What should you do while reversing mobile plant if you lose sight of the vehicle marshaller who is directing you?

38 / 41

On demolition sites, what must the drivers of plant have, for their own and others' safety?

39 / 41

Who must be the first person a demolition contractor appoints before undertaking demolition operations?

40 / 41

If asbestos is present, what should happen before demolition or refurbishment takes place?

41 / 41

Who should be consulted before demolition is carried out near to overhead cables?

Your score is

The average score is 93%

Exit

How was the test? Please Submit your Rating and give us a feedback!

Thank you for taking the time to complete a mock test on our website. We appreciate your effort and dedication.

We wish you the best of luck in your preparation and future exams. If you have any feedback or suggestions, please let us know.

Leave a Reply

Your email address will not be published. Required fields are marked *